Data Center Migration
Same-city or cross-border moves, cut over in business-approved waves with a rollback path at every step.
Assessment
Equipment list, dependencies, outage windows and risk register.
Wave plan
Waves by business priority, each with acceptance and rollback criteria.
Physical move
ESD packaging, climate-controlled transport, customs paperwork where needed.
Destination build
Rack and patch to the new drawing, power-on and per-unit validation.
Cutover
DNS / BGP / load-balancer switch with a rehearsed rollback.
How it runs
- Survey both sites: power, cooling, network
- Deliver the migration plan and schedule; agree outage windows
- Execute wave by wave with validation after each
- Exit or keep cold standby at the old site
Coverage
- Equinix 香港(HK1 / HK2 / HK3 / HK4)
- MEGA-i(新世界电讯)
- Digital Realty 香港
- NTT 香港
- Global Switch 香港
- 自有合作机房:荃湾 / 葵涌 / 将军澳
FAQ
How is response time measured?
From written acceptance of your ticket. 4 小时 standard, 1 小时 emergency, 7×24.
Which facilities do you cover?
Major Hong Kong carrier-neutral sites plus our own partner facilities: Equinix 香港(HK1 / HK2 / HK3 / HK4); MEGA-i(新世界电讯); Digital Realty 香港; NTT 香港; Global Switch 香港; 自有合作机房:荃湾 / 葵涌 / 将军澳. Other sites assessed case by case.
How is it priced?
Per ticket with a two-hour minimum, or a monthly retainer for regular work. Written quote based on site and task type.
Can we watch the work?
Yes — live photos, recording or a video call, with a full on-site record afterwards.
How is data handled?
Engineers sign NDAs; any task involving storage media is witnessed and logged, with optional recording.
Need a quote for this service?
Send the site, rack position and task, and we reply with a plan and quote within one business day.